Join Policy

Join PolicyOur Support
HomeJoin UsJoin Policy

Franchise Requirements

  • 1, The distributors must have a formal company license under legal operation and with complete business procedures
  • 2, The distributors must have the trofessional sales and customer service team
  • 3, Have certain financial strength, and have good brand awareness and differentiated marketing ideas
  • 3, Have the Office space or the terminal showing store
  • 4, Good reputation and good connections in the local market
  • 5, Recognize the culture of Henergy Solar and obey the management under us.
  • 6, Priority for those engaged in household appliances or new energy industry.

Join Process

  • Join Consulting

    Option 1: Telephone or Email consultation
    Option 2: Submit the application online
    Option 3: offline negotiation

    01

    01
  • Franchise Negotiation

    Communicate relevant qualifications and reach cooperation intention

    02

    02
  • Qualification Review

    Submit qualification documents

    03

    03
  • Achieve Cooperation

    Formal signing, deposit payment, authorized dealer certificate formal signing,authorized dealer certificate formal signing.

    04

    04

Responsibilities of dealers

  • 01

    Responsible for channel development and product sales in the local market to complete the annual sales task

  • 02

    Implement the market strategy of Henergy Solar
    Independently complete pre-sales, in-process and after-sales services

  • 03

    Catch the customer requires in time
    Improve customer satisfaction through high quality services

  • 04

    Collect market trends and end-user opinions
    Regularly provided to Henergy Solar team

Business development process

Pre sales Q&A
  • Customer Consultation

  • Q&A

  • Site Investigation

  • Determine the installed capacity

  • Investment income ratio

On sale installation
  • Prepare grid connection
    & Formalities

  • Sign the
    contract

  • Customer
    prepayments

  • System
    Installation

  • Grid connection
    Inspections

After-sale service
  • System balance
    settlement

  • Power generation
    Monitoring by APP

  • Using Guidance

  • Troubleshooting

  • Regular operation
    & maintenance

Grid connection process and related instructions

  • 01

    User submits grid connection application

  • 02

    Electric Power Bureau conducts
    site survey

  • 03

    The electric power bureau reply with access plan

  • 04

    The dealer carries out power station construction

  • 05

    Electric power bureau signs contract with user

  • 06

    Acceptance by Bureau,Commissioning,grid connection

Description of user grid connection application

The grid connection application shall be submitted in the business office of the electric power bureau. The required application materials include:
1. Original and copy of resident identity card;
2. House property certificate or other documents certifying the use of the house;

Description of responsibilities of electric power

1. After accepting the user's application, the electric power bureau will make an appointment to survey the site and issue an access plan;

2. The electric power bureau shall install meters for users and sign power purchase contracts before grid connection;

3. The electric power bureau arranges staff to come to the site to check and accept the grid connection commissioning for users;